Jivesh EnterprisesEntry → Exit
Skip to content
Crew laying fibre optic cable beside a highway with a tracked plough and cable drum
All projects

OFC Laying · JIO · 2023

Client
JIO
Year
2023
Route length
38 km
Location
Mandsaur – Pratapgarh
State
Madhya Pradesh
Service
OFC Laying

Project overview

Mandsaur – Pratapgarh Fibre Corridor was delivered for JIO in 2023, covering a route of 38 km in Madhya Pradesh.

Scope

  • Backhaul fibre corridor between Mandsaur and Pratapgarh
Crew laying fibre optic cable beside a highway with a tracked plough and cable drum
GOODENG horizontal directional drilling rig on a work site, with drill rod rack and cable chain
Tata Hitachi EX200 LC excavator on an earthworks site

Start a project

Share your project scope — HDD crossings, fibre corridors, pipelines or testing — and our team will get back to you.