HDD DrillingHard Rock HDD Crossing – Gujarat
Critical hard rock HDD road crossing for telecom duct installation.
JIO · 2.5 km · Gujarat
Trenchless crossings through soil and hard rock — without opening the surface.


Overview
Jivesh Enterprises delivers HDD for telecom ducts, gas and water pipelines where open trenching is impractical.
Our own HDD fleet — GOODENG, Drillto and Apollo rigs — allows us to plan and execute road, rail and hard rock crossings with crews and machines we control directly.
What we do
Capabilities
Own HDD machinery fleet
Hard rock specialisation
Road & rail crossings
BSNL, JIO & BharatNet experience
Process
A typical sequence of work. Each project is planned against its own route and site conditions.
STEP 01
Route, entry and exit points and crossing profile are planned against site conditions.
STEP 02
A guided pilot hole is drilled along the planned alignment.
STEP 03
The bore is enlarged to suit the duct or pipe diameter, with drilling fluid managed throughout.
STEP 04
Duct or pipe is pulled back through the finished bore.
STEP 05
The crossing is recorded and documented for handover.
Applications
Next service
OFC Cable Laying
Start a project
Share your project scope — HDD crossings, fibre corridors, pipelines or testing — and our team will get back to you.