MDPE, GI and ERW gas networks — installed, crossed and pressure-tested.

Coated steel pipeline sections strung out along a construction right-of-way
Crane lowering a pipe section into an open trench while the crew guides it into place
Pipeline lowering-in

Overview

MDPE, GI and ERW gas pipeline installation with HDD crossings and hydro testing.

Jivesh Enterprises has worked on city gas distribution pipelines, including an MDPE pipeline in Maharashtra with HDD crossings and hydro testing.

What we do

  • MDPE pipeline installation
  • GI pipeline installation
  • ERW pipeline installation
  • HDD crossings
  • Hydro testing

Capabilities

01

Own hydro testing equipment

02

HDD crossings

03

City gas distribution experience

04

Clients include Think Gas and Bharat Gas

Process

A typical sequence of work. Each project is planned against its own route and site conditions.

  1. 01

    Alignment

    Pipeline route and crossings are set out.

  2. 02

    Laying & crossings

    Pipe is laid, with HDD at crossings.

  3. 03

    Hydro testing

    The network is pressure tested with our hydro testing equipment.

  4. 04

    Handover

    Test records and documentation are handed over.

Applications

  • City gas distribution
  • MDPE networks
  • Steel (GI / ERW) lines

Next service

Water Pipeline Projects

Start a project

Share your project scope — HDD crossings, fibre corridors, pipelines or testing — and our team will get back to you.