Jivesh EnterprisesEntry → Exit
Skip to content
Compact HDD drilling machine set up at a bore entry point with drill rods loaded
All projects

OFC Laying · HFCL · 2022

Client
HFCL
Year
2022
Route length
85 km
Location
Uttar Pradesh
State
Uttar Pradesh
Service
OFC Laying

Project overview

HFCL OFC Backbone – UP was delivered for HFCL in 2022, covering a route of 85 km in Uttar Pradesh.

Scope

  • OFC backbone execution for HFCL
  • hard rock HDD sections
Compact HDD drilling machine set up at a bore entry point with drill rods loaded
GOODENG horizontal directional drilling rig on a work site, with drill rod rack and cable chain
Tata Hitachi EX200 LC excavator on an earthworks site

Start a project

Share your project scope — HDD crossings, fibre corridors, pipelines or testing — and our team will get back to you.