Jivesh EnterprisesEntry → Exit
Skip to content
Technician fusion splicing optical fibre in the field beside a splice tray
All projects

OFC Laying · JIO · 2022

Client
JIO
Year
2022
Route length
72 km
Location
Thandla – Khawasa
State
Madhya Pradesh
Service
OFC Laying

Project overview

Thandla – Khawasa MP OFC was delivered for JIO in 2022, covering a route of 72 km in Madhya Pradesh.

Scope

  • Inter-city OFC link
  • utility coordination and HDD crossings
Technician fusion splicing optical fibre in the field beside a splice tray
GOODENG horizontal directional drilling rig on a work site, with drill rod rack and cable chain
Tata Hitachi EX200 LC excavator on an earthworks site

Start a project

Share your project scope — HDD crossings, fibre corridors, pipelines or testing — and our team will get back to you.